This is The North East | CommuniGate | READHEAD'S SHIPYARD Feedback
This is The North East -  CommuniGate
*
Content * * *
John Readhead & Sons - Introduction

John Readhead & Sons - History

John Readhead and Sons - the People

Readhead's Ships

Readheads Ships, including photos

The Technical Offices & Head Office

The Engine Works & Drawing Office

Readhead's Timeline

Local Memories

The Steel Trades

The Outfitting Trades

Other trades

Royal Visits

More photo's

Newspaper & website publicity

The West Docks

The Readhead Family Tree

Readhead's Customers

Local Pubs, social scene, sports, Ashley House & Woodies sho

The Readhead Shipping Line

Readhead's Launch Photos

Photos

Photos 2

UNDER CONSTRUCTION

UNDER CONSTRUCTION 2

UNDER CONSTRUCTION 3

UNDER CONSTRUCTION 4

UNDER CONSTRUCTION 5

Message Board

Guestbook

Mail Form

*

The Driller and Riveter

The picture above shows how ships were built before the modern way of using units or blocks.
The frames were formed in the shed and then individually erected on the berth. The plates were added one at a time.

The Driller
In the early years a driller worked with a ratchet but this method took an unbearable length of time and was extremely boring. The steam punch was better. Later the authorities were to introduce machines of the "air" and "electric'' variety - all in the name of progress - to which the men quickly adapted.
The Riveter
Over the past 20 years or so ships have been fabricated in large welded blocks weighing in many cases hundreds of tons. These blocks or units are taken from the fabrication areas and erected on the building berth or in the dock. Up until the 1940/50s ships were built by a different method. This involved cutting, shaping or bending individual steel plates, bars or angles to the required shape and punching them with rivet holes. These parts were then taken piecemeal to the building berth where they were first bolted together and then riveted using steel rivets. Originally, riveting was carried out by a rivet squad comprising four or five men. These were a left and right handed riveter to literally hit the red hot rivet with a rivet hammer, a 'holder on' who held the rivet in place while it was riveted, a 'heater boy' whose job it was to heat the rivet to the appropriate temperature. Hand riveting would have been used but much of it would have been completed using pneumatic hand tools and larger hydraulic machines.
Hand Riveting
The rivets were heated to a 'red heat' over a hearth and placed in previously punched holes. The head was 'held up'with a hammer by one man while the riveter hammered the projecting end into the required 'point'. The hot metal fills the hole, cools down, contracts and draws the metal plates together.
Hydraulic Riveting
Hydraulic riveting machines had U shaped jaws, acting as 'holder-upper' while a hand ram fitted with a hemispherical die formed the point. Pressure applied by the ram squeezed the point into shape with a single movement.
Pneumatic Riveting
Pneumatic hammers were worked by compressed air, enabling the riveting team to work much faster.
The rivets were made from round steel bars, cut to the required length. A head was formed at one end, and the other end, when riveted up, was called a 'point'.
Riveting was a dirty and dangerous job. To earn a living riveters had to work in closely co-ordinated teams known as 'squads'. Each squad functioned as a fiercely independent unit whose earnings were directly related to their ability to work as a team.
Working conditions were brutal. No work no pay was the rule !….in all weathers ...in exposed and cramped working conditions...with variable pay rates and no security of employment. Riveters had no options but to work long and hard... as long as work was available

Memories of Riveting

A view of the yard. Plates are stacked ready for fitting.
Memories from Bill Stephenson
The Rivet Squad
When I first started work at Readheads the ships were nearly all riveted.
Riveted seams, butts, frames and beams. The frames were joggled, as were the beams.
It may not be generally known but in the days of hand riveting it took 5 men to knock in a rivet. There was;-
The Heater
He was the man who heated the rivets until they were totally red hot, then, with tongs he would throw the hot rivet to;-
The Catcher
He would catch the rivet in his can and with tongs place the rivet in to the rivet hole. Then;-
The Holder-on
Would then baulk and back-up the rivet with a very heavy hammer. Then the;-
Riveters, one left-handed and one right-handed, would clench over the rivet with alternate strikes.

This was all done at speed so that the ‘clenching-over’ could be completed before the red-hot rivet cooled.
The riveting teams were wonderful workers, when you consider the number of ships that Readhead’s built, their achievements were excellent.

The Blacksmiths

Info wanted

Ernie Alexander was Foreman in the sixties I think.

The Welding Department

Quick way to light a fag.

The Platers

Fabrication of plates.

Steel Finishing

Grinding work on a funnel fabrication - no safety glasses in the sixties!

Platers

Checking the job

Riveter at work

This was being done at the ship owners request.

Frame Bending

Employee carefully bending a frame.

Fabrication

With better cranage bigger units could be fabricated in the shed and lifted into position on the vessel on the berth.
No safety railings in those days.

This page has been visited times.

Email Email page
Feedback Feedback
Home Home


John Readhead & Sons - Introduction |John Readhead & Sons - History |John Readhead and Sons - the People |Readhead's Ships |Readheads Ships, including photos |The Technical Offices & Head Office |The Engine Works & Drawing Office |Readhead's Timeline |Local Memories |The Steel Trades |The Outfitting Trades |Other trades |Royal Visits |More photo's |Newspaper & website publicity |The West Docks |The Readhead Family Tree |Readhead's Customers |Local Pubs, social scene, sports, Ashley House & Woodies sho |The Readhead Shipping Line |Readhead's Launch Photos |Photos |Photos 2 |UNDER CONSTRUCTION |UNDER CONSTRUCTION 2 |UNDER CONSTRUCTION 3 |UNDER CONSTRUCTION 4 |UNDER CONSTRUCTION 5 |Message Board |Guestbook |Mail Form