It is intended, by the use of photos to show how the TSGR has developed over the past years. (1993-to present date)
Virgin Territory!
This is the area where the Station is intended to be built, also main track and passing loop will be built here. |  |
|
Start of the ground level track
 | | A view from the public footpath of the ground level track, this will consist of a 7 1/4inch and 5inch rails. At a later date it is planned to build a bridge, roughly, in the area of the middle of this photo. |
|
Track Construction
 | | Club members constructing the base of the ground level track, 20 tons of ballest were used site wide.(1994) |
|
Turntable (1)
 | | The turntable area is to have six steaming bays attached to it, three will cater for the 7 1/4inch and 5inch ground level locos, and three will be for the 5inch and 3 1/2 inch elevated locos. A back axel from a ford transit van will be used for the centre of the turntable. (1995.96) |
|
Turntable (2)
 | | Back axle in place, brickwork nearly finished, the brickwork is being built by Arcon 2000, a government funded scheme for the unemployed, They (Arcon 2000) also build the signal-box/ticket office, this can be seen in the back ground. |
|
Turntable (3)
 | The turntable is finished and is now in full time use, the back axle allows for 360 degree turning, and to date the turntable is working very well indeed.
|
|
Station 1
| The start of the construction of the signal box/ ticket office, and the loading and unloading platforms. |  |
|
Station 2
| The ground level track is starting to be laid, but by whom? is any body guess. |  |
|
Station 3
| Platform area paved, signalbox/ticket office brick work finished, main line, passing loop now in place.(1995) |  |
|
Station 4
| Signal box/Ticket office now ready for the roof, the platform areas will be covered, and the roofs are to be supported with four pillers. |  |
|
Station 5
| "Four down, Four to go" All the post used were rescued from a council tip, cleaned up and painted.(1996) |  |
|
Station 6
| Both platform conopies now in place, completion of the station area now in sight? |  |
|
Station 7
| "Finished" Signal box/Ticket office and the platforms all ready for use. At the end of the right hand platform there is a 1,000 litre water tower.(Late 1996) |  |
|